KDM organized the logistics of laboratory modules for a project in Kigali on behalf of Wesemann International. The project ranged from providing a facility for assembly in Germany to temporary storage and subsequent delivery to the destination country. Sensitive cleanroom modules and changing delivery dates posed special challenges for transportation and storage.

The project

The laboratory modules first had to be disassembled in Germany and then transported to Kigali. To this end, we organized storage and production capacity, arranged for the pickup of the raw modules, and prepared them for disassembly by Wesemann. Once the work was completed, we took over the rest of the transportation arrangements through delivery in Rwanda.

This meant that our work began even before the actual export. The warehouse, the finishing work, and the subsequent pickup all had to be coordinated in terms of timing.

The Challenge

The sensitive equipment in the cleanroom modules required transport with as little vibration as possible. The sea voyage was followed by a long overland journey from the port of Mombasa via Nairobi and Kampala to Kigali.

At the same time, the customer’s schedule changed. As a result, the modules had to be temporarily stored in the destination country and delivered only at the agreed-upon time. The logistics team had to accommodate this change without compromising the protection of the sensitive cargo.

Our Solution

After disassembly, we arranged for the pickup of the finished modules, their transfer to Mafi roll trailers, and their shipment via Ro-Ro. For the subsequent road transport to Kigali, air-suspension chassis were used to reduce the impact of bumps.

In Rwanda, we coordinated the temporary storage and subsequent delivery. For the on-site work, we arranged for cranes, forklifts, and aerial work platforms. We also procured containers for storing small parts. This ensured that, in addition to the modules, the necessary storage and handling equipment was available.

The result

Die Module wurden nach der Zwischenlagerung im Bestimmungsland termingerecht und ohne Beschädigungen ausgeliefert. Wesemann erhielt eine Logistiklösung, die den Ausbau in Deutschland, den internationalen Transport und die angepassten Abruftermine in Kigali miteinander verband. 